2020-2021 Catalog and Student Handbook

PETR 342 Production Systems Engineering I

Completion techniques; flowing well performance using Nodal analysis; design of gas lift, plunger lift, electric submersible pump, and sucker rod pumping production systems; preview of stimulation techniques; design considerations; and economics.

Credits

3

Prerequisite

Complete PETR 216 & PETR 317